← Back to SOC 1

SOC 1 Checklist: 34 ITGC Controls

Complete checklist covering the IT general controls a SOC 1 examination assesses. Track your progress toward a clean Type 2 opinion. Most organizations with an existing SOC 2 or SOX program already satisfy 70-90% of these.

34
Total Controls
5
ITGC Domains
6-12 mo
Type 2 Period
CE

Control Environment

Entity-level governance, policies, and oversight

SOC1.CE.1: Information security policy approved and communicated
SOC1.CE.2: Entity-level risk assessment covering ICFR-relevant services
SOC1.CE.3: Code of conduct and ethics
SOC1.CE.4: Defined organizational structure and reporting lines
SOC1.CE.5: Vendor and subservice organization oversight
APD

Access to Programs and Data

Who can access in-scope systems, and how

Identity & Authentication

SOC1.APD.1: Documented access request and approval
SOC1.APD.2: User provisioning aligned to least privilege
SOC1.APD.3: Password and authentication standards
SOC1.APD.4: MFA for remote and sensitive system access

Privileged Access & Review

SOC1.APD.5: Privileged access restricted and monitored
SOC1.APD.6: Periodic user access review and remediation
SOC1.APD.7: Timely access revocation on termination or transfer
SOC1.APD.8: Segregation of duties or compensating controls

Data & Network Controls

SOC1.APD.9: Direct database access restricted; direct data changes logged and reviewed
SOC1.APD.10: Network segmentation and perimeter controls for in-scope systems
PD

Program Development

New systems and significant enhancements

SOC1.PD.1: Documented SDLC methodology
SOC1.PD.2: Testing and user acceptance before go-live
SOC1.PD.3: Data migration validated for completeness and accuracy
SOC1.PD.4: Peer review of security-relevant code
CHG

Program Changes

Ongoing changes to in-scope applications and infrastructure

SOC1.CHG.1: Formal change request and authorization
SOC1.CHG.2: Changes tested in a non-production environment
SOC1.CHG.3: Separation of development, test, and production environments
SOC1.CHG.4: Emergency change procedure with after-the-fact review
SOC1.CHG.5: Only authorized personnel migrate changes to production
SOC1.CHG.6: End-to-end audit trail retained on each change ticket
OPS

Computer Operations

Processing, backup, DR, monitoring, incidents, and physical security

Processing & Recovery

SOC1.OPS.1: Batch job scheduling and execution
SOC1.OPS.2: Job failure detection, triage, and resolution
SOC1.OPS.3: Production data backup on defined schedule
SOC1.OPS.4: Backup restoration tested periodically
SOC1.OPS.5: DR plan documented and tested annually

Monitoring & Physical

SOC1.OPS.6: Incident management and user-entity communication
SOC1.OPS.7: Capacity and performance monitoring against SLOs
SOC1.OPS.8: Security event logging, retention, and review
SOC1.OPS.9: Physical and environmental security for in-scope sites

Beyond the Controls

What goes into the actual SOC 1 report

Section 3: System Description

Services provided and boundaries of the system
Infrastructure, software, people, and data in scope
Subservice organizations (inclusive vs. carve-out)
Complementary user entity controls (CUECs)
Changes to the system during the reporting period

Section 4: Control Testing

Control objectives mapped to financial assertions
Specific controls supporting each objective
Tests performed by the service auditor
Results of testing and any deviations noted
Management response to deviations (if any)

Ready to run this checklist with a human in the loop?

Book a 20-minute scoping call. We'll help you decide between Type 1 and Type 2 and map each control to evidence you already have.